The arithmetic

The admin is a wage you're already paying.

Put your numbers in. Every constant on this page is cited, labelled, and deliberately conservative — the workings sit on the table, not behind a lead form. This is a model, not a measurement of olab: none of these constants was timed on a site running olab, because no site has run olab yet.

A MODEL, NOT AN OBSERVED RESULT · NO EMAIL GATE · EVERY CONSTANT SOURCED BELOW
The manual way One daily report · Tue 1 Sep · Ashwick DC Waiting Five hops 1PhotographCamera roll · 1,208 photos · 14:31 2Message“Gland torqued, will send pic later” · site group16:40 3RetypeThe day typed at home, from memory21:04 4ChaseRE: RE: A3 torque? · three replies · waiting on DaveThu 5ReconcileDiary 45 Nm, sheet 40 Nm, chat unknownMonth end 40 minon paper, per daily report Five hops before any of it is a record. The photograph never meets the task it belongs to. In olab The same report · Tue 1 Sep · Ashwick DC Waiting One hop 1CaptureIn the app · Task 0412 · Panel A3 · 14:31 2VerifyAI checks, then Aoife Brennan signs14:32 3AssembleDaily log, register and valuation, from the record14:33 Termination A3 · verified · AB Nobody retyped anything · PDF and CSV on demand 5 minin olab, per daily report 35 min saved per report Contractor ToolStack, 2026 · independent test Default crew · €13,673 a year
One report · five hops vs one · the workings below
The calculator

Put your numbers in.

What comes out is a model built from the published sources named below — not a result anyone has observed on a site using olab. Treat it as the size of the prize a pilot would have to go and measure.

Your numbers

Sets the denominator for the sanity check in the results — headcount never multiplies the sum.

BLS puts the median US construction manager at $55.28/hr in wages (May 2025) and benefits at ~30% of compensation (ECEC, Mar 2026); UK site engineers run ~£50k+ (Hays, 2024); a 1.25–1.4× loaded multiplier is the standard reference (Hadzima, MIT).

The $/£ switch changes the symbol only — no constant converts. Set the rate to your own currency's number.

What the model returns
Hours / week4.8 h
Hours / year249 h
Cost / month1,139
Cost / year13,673
BELOW THE REPORTED BAND

That's 0.6 h per person per week — the industry-reported band is 2–6 h/person/week (Procore × Dodge Construction Network, 2026 Specialty Contractor ROI Report).

The model claims less than the surveys say is lost. That is deliberate.

5 reports/wk × 35 min × 52 + 40 snags/mo × 8 min × 12 + 1 update/wk × 38 min × 52 = 14,916 min ÷ 60 = 248.6 h/yr × €55 = €13,673/yr (÷12 → €1,139/mo · ÷52 → 4.8 h/wk)

Recovered capacity valued at your loaded rate — minutes come back as attention on site; only you can turn them into payroll.

The workings

Three record types, nothing else.

Each row's basis is stated beside it, at its honest confidence. Two of the three "with olab" figures are our own assumptions and are chipped as such; none of the three has been timed on a live job.

ItemManualWith olabSavedBasis
Daily report 40 min 5 min review 35 min / report An independent timed test completed a photo-documented daily report in 4 m 38 s vs 40+ min on paper (Contractor ToolStack, 2026). Raken's published case studies report superintendents recovering an hour or more per day (vendor-published) — corroboration only, never summed.
Snag round-trip admin 12 min 4 min 8 min / snag Conservative assumption, stated as ours — no independent benchmark exists; vendor-class claims run higher. The manual round trip: photograph → message → retype → chase.
Weekly client update 45 min 7 min 38 min / week Counted only while the toggle is on. Buildertrend reports client updates falling from 30–60 min to ~6.5 min with AI drafting (vendor claim, June 2025) — we use the midpoint conservatively.
Hunting for project information 2–6 h / person / wk NOT COUNTED The industry-reported band (Procore × Dodge Construction Network, 2026 Specialty Contractor ROI Report). We use it only as the sanity check above — stacking a generic search-time row into the sum is how savings calculators inflate. Ours doesn't.

Every constant, sourced

Ranked by how much you should trust it: INDEPENDENT TEST timed by someone with nothing to sell · SURVEYED industry survey data · VENDOR CLAIM a vendor's own published figure · OUR ASSUMPTION ours, sized low — trust it least.

ConstantValueSource · yearStatus
Daily report, manual40 minTimed paper baseline, "40+ minutes" — Contractor ToolStack, 2026INDEPENDENT TEST
Daily report, in-app5 minTimed at 4 m 38 s, photo-documented, in the same independent comparison; we round up — Contractor ToolStack, 2026INDEPENDENT TEST
Superintendent time recovered≥ 1 h / dayRaken published case studies (vendor-published) — corroboration only, never enters the sumVENDOR CLAIM
Snag round-trip, manual12 minOurs: photograph → message → retype → chase. No independent benchmark existsOUR ASSUMPTION
Snag round-trip, in olab4 minOurs, sized low — vendor-class claims run higherOUR ASSUMPTION
Client update, manual45 minMidpoint of the 30–60 min Buildertrend reports — June 2025VENDOR CLAIM
Client update, AI-drafted7 minBuildertrend reports ~6.5 min with AI drafting; we round up — June 2025VENDOR CLAIM
US wage baseline$55.28 / hrBLS, median US construction manager wage — May 2025SURVEYED
Benefits share~30% of compensationBLS Employer Costs for Employee Compensation (ECEC) — Mar 2026SURVEYED
UK cross-check~£50k+ / yrSite engineers — Hays salary guide, 2024SURVEYED
Loaded-cost multiplier1.25–1.4×The standard reference — Hadzima, MITSURVEYED
Default rate on this page€55 / hrOur default, drawn from the four rows above — the slider is yoursOUR ASSUMPTION
Sanity band2–6 h / person / wkProcore × Dodge Construction Network — 2026 Specialty Contractor ROI ReportSURVEYED
The problem, cited

There's time to recover because the old way leaks it.

Each figure carries its survey, its year and its sample size — and we never stack figures that share a source family and call it corroboration. One representative number per source, nothing compounded.

5.5h / wk
per person, spent just looking for project data — field supervisors report the worst of it, at 15.84 h/wk across non-optimal activities FMI + PlanGrid, "Construction Disconnected" (2018, n=599) · survey-derived
34%
of safety data still gathered in spreadsheets, and 25% on paper forms — paper averages 14% across data types, and is declining Dodge Data & Analytics SmartMarket (2019, n=187, US) · survey-derived
68%
of construction executives rank technology as critical to their strategic priorities KPMG Global Construction Survey 2025/26 (n=375 leaders, Mar 2026) · survey-derived
The honest close

Judge it on a pilot,
not on this page.

This model is deliberately conservative: it counts only three record types, and ignores rework avoided, dispute defence, and month-end reconciliation entirely — the places a verified record earns its keep. Judge it on a pilot instead.